Back to Resumes List

Survey Engineer

Objective


To Work On Prestigious Civil Engineering Project, Utilizing State Of The Art And Computer Based Project Management Techniques To Its Timely And Successful Completion with use of Latest Digital Survey Instruments Like Total Station, Lasers And GPS etc .


Experience


1: Working as Survey Engineer with venco imtiaz (VICC) construction company in Afganistan, Kabul (Feb. 2009 to till now)



Client: USAID

Consultant: N/A

Project Name: Agriculture project and Runway in Lashkar gaha, Halamand province



Responsibilities

A: Topographic survey for Designing and construction activities.

B: Establishing all control points

C: Making as built for all work done by auto cad

D: Calculating All Stake out Data for all kind of work on site

E: controlling all survey work like stake out of sewer line. Water line and Arch Gate etc

F: Down loading survey data from Total station and sending to main office.



2: Worked as Senior Land Surveyor with SURTECH INTERNATIONAL LTD (for LEIGHTON CONSTRUCTION ) Abu Dhabi (UAE) (Oct. 2008 to Fab 2009 )

Client: Tourism Development and investment company Abu Dhabi(UAE)

Consultant: SURBANA

Project Name: Tourism Development investment company Head Quarter building (G-3 and G+8 total 12 stories.

Responsibilities

A: All kind of stake out like pile, column footing, Retaining wall and roof slabs etc.

B: Establishing all control points

C: Making as built for all work done by auto cad

D: Calculating All Stake out Data for all kind of work on site

E: Topographic, Utility survey on different project in UAE



3: Worked as Survey Manager with Al Nahar Company Limited Libya (A Department Established By The Government of Libya) (Nov.2006 to August 2008)

Client: Great Man Made River Authority (Gmra) Libya

Consultant: Brown &Root North Africa

Project Name: Great Man-Made River Project Tat (Tripoli To Bir Tirfas), PCCP Pipe Line 3800 To 1600 Mm Dia (I.D) For Irrigation &Water Supply Purpose In Libya.



Responsibilities

A: To Establish Main Control Points With GPS 1200 System of Lieca Using Rtk Survey Technique.

B: Stake Out R.O.W (Right Of Way) With GPS

C: To Stake Out Centre Line for Pipe Line by Total Station.

D: Calculating All Stake Out Data For R.O.W, Pipe Centre Line And For Haul Road

E: To Calculate Level According To Design Profile Of Haul Road

F: Making Travers For Primary Control Points

G: Laying Of Control Points Along Trench (By Traversing)

H: Receiving Of Trench From Sub Contractor According To Specification &Design.

I: To Handle All Matters Related With Survey

J: Supervise All Survey Activities & Fix Duties Of Survey Team

K: Making All Scope Drawings, Cross Sections And Cut / Fill Quantities Of Haul Road By Auto Cad.



4: Worked as Survey Engineer with Al Nahar Company Limited Libya (A Department Established By The Government of Libya) (Nov.2004 To Nov 2006)

Client: Great Man Made River Authority (Gmra) Libya

Consultant: Brown &Root North Africa

Project Name: Great Man-Made River Project Phase Iii –Al Gardabya / Assdada Link.

Project Is Consisting To Make A PCCP Pipe Line 4000 Mm Dia (I.D) for Irrigation &Water Supply Purpose In Libya.



Responsibilities

A: To Stake Out Centre Line for Pipe Line by Total Station,

B: Laying Of Control Points along Trench (By Traversing)

C: Receiving Of Trench from Sub Contractor According To Specification &Design.

D: To Handle All Matters Related With Survey

E: Supervise All Survey Activities & Fix Duties of Survey Team



5: Worked with Sui Northern Gas Pipe Line Limited (Pakistan) as Senior Surveyor

(Feb 2004 to Oct 2004)

Responsibilities:

A: Selection Of Route For Pipe Line (Rout Survey) By Global Positioning System (G.P.S)

B: Making Stationing And Reading Profile On Selected Route.

C: Making Plan Of Crossings And Draw Profile

D: All Other Survey Activities For Required For Design of Rout

E: Collecting All Topography Detail along the Selected Rout


Education

Certification

Skils

 

pindi bhattian,
View Contact Information