Duties and Responsibilities:

• Indorse working permit for rigging activities and for piping hot work permit

• Erection of pipe spool and pre-laying of pipes

• Static and dynamic lifting of all materials from supply boat to platform.

• Manual handling of all materials and equipment

• Inspection of tools and all rigging equipment

• Banksman

September 27, 2008 to June 23, 2009

Rigger (Piping)

Samsung Corporation

Borouge2 OCU Project

P.O. Box 12455, Ruwais

Abu Dhabi UAE

Duties and Responsibilities:

• Erection of pipe spools and pipe laying

• Loading and Unloading of materials and equipment

• Inspect all the rigging equipment

April 14, 2006 to March 14, 2008

Rigger III ARAMCO certified #5616

Consolidated Contractors Company (CCC)

Khursaniyah Gas Plant (KGP) Project

Jubail, KSA

Duties and Responsibilities:

• Lifting of tools, pipes and pipe layering

• Thorough inspection of rigging equipment before using it, identification of defective rigging

• Working in coordination with the equipment operator in terms of signal agreement or any form of communication to be used before attempting to move any load or object.

• Inspection of rigging equipments and identification of defective rigging.

• Regular inspection of rigging during extended work periods

• Ensure safety and awareness in every lifting and rigging activities to be undertaken

March 12, 2000 – June 13, 2001


DAELIM Philippines Inc. (DPI)

Ilijan 1200 MW Combined Gas Cycle Power Plant Project

Ilijan, Batangas City, Philippines

Duties and Responsibilities:

• Inspection of all rigging equipments.

• Underwater pipe layering.

• Lifting of tools and equipment to get them where they are needed

• Making sure that the equipment operator agrees on the signals to be used before attempting to move any object

• Test lifting an object 1 to 2 inches to ensure that it is balanced

• Ensure safety with regards to awareness of suspended load and when handling wire rope

• Determining of weights and distances; proper selection and usage of lifting tackle

• Regular inspection of rigging during extended work periods





Batangas City, Batangas,