Objective
A Position where I can utilize my technical skills combined with my experience to be a Facilities Maintenance 
Technician.
Experience
2010 to current	Jobs since leaving Lee Technologies
10/2010 to 11/2010	Mt Sinai Hospital
			Temporary job performed maintenance of the facilities of the hospital.
03/2011 to 07/2011	Norfolk Southern Rail Road
			Carman
			Repaired freight cars in need of repair.
2009 to 2010		Lee Technologies
			Facilities Resource Technician
•	Respond to SCADA alarms when generated.
•	Monitored 9 4000HP MTU generators when online along with fuel usage and temperature.
•	Monitored 12 1260 ton York Chillers while running.
•	Transferred loads from preferred to alternate and back.
•	Write MOPs (Method of Procedure) for the facility.
•	Checked Liebert UPS models 6500.
•	Filled out reports on the condition of the facility and forwarded to the critical environment group.
2007 to 2009		Union Pacific Railroad, Omaha, Nebraska
			Signal Maintainer
•	Performed Monthly, Quarterly, Biannual, and Annual FRA Test
•	Maintained signal system.
•	Completed FRA required reports.
•	Be on-call for trouble calls.
2004 to 2007		ITT Industries, Fort Irwin, California
			Controls Technician
•	Monitored and serviced Pyrotronix Fire control system.
•	Substation maintenance of high voltage lines.
•	Maintain thirteen caterpillar engines to be within +/-2% of their amplitude and frequency outputs across the complex.
•	Power Plant start up, shut down, monitoring, record keeping and maintenance for 
	peak demand and missions.
•	Facilities maintenance of Reverse Osmosis water system.
•	Maintained Antennas.
2003 to 2004		Yamas Controls of Southern California, Anaheim, California 
			Technician
•	Performed preventative maintenance and service of HVAC controls.
•	Checked out and started up controls with a Niagara front end in a construction environment.
1993 to 2003		Siemens Building Technologies, Cypress, California
			Service Technician
•	Checked out and start up HVAC controls with Insight front end in a construction environment. 
•	Worked in PLC research and development group for three years.
•	Tested Firmware for the new Staefa product line.
•	Wrote, edited, corrected, and executed test procedures.
Continued
•	Performed UL compliance testing on the new product line.
•	Entered Firmware defects and procedural defects into Tracker database.
•	Developed analog input board for developers to use in writing and testing code. 
1989 -1993	Sencon Electronics, Bedford Park, Illinois
	Test Engineering Technician 
•	Tested and troubleshot printed circuit boards to the component level.
•	Repaired units returned from the field.
1988 to 1989	ESAB Welding Products, Chicago, Illinois
	Quality Control Inspector 
•	Inspected all welding products for correct electrical and mechanical assembly comparing 
	       them to blueprints. 
•	Tested the products for proper operation with electronic test fixtures and troubleshot and 
	       repaired all defective products.
•	Hi-pot tested transformers for internal shorts.
•	Read blue prints and compared to manufactured products.
Education
1986 -1988	Devry Institute of Technology, Chicago, Illinois
	Electronics Technician’s Diploma
	Presidential Honor Society, GPA 3.68/4.00
1997 -2000	McHenry County College, Crystal Lake, Illinois
	Over Thirty Credit Hours General Education
Certification
Skils