Back to Resumes List

E&I Inspector

QA/QC

•Address : Republic of Korea. 250, Bongsu-ro, Dong-guUlsan

•Nationality : South Korean

•Date of Birth : June, 15, 1984

•Objective : Important things of Inspector is skill and judgment. But the most of Important thing is hardworking  and  honesty working. Also,

Technically Inspector is always must have to do  find a portential risk and must have to Highly critical thinking to do Inspection.

•Education :            

*MAR. 2003~FEB.2007 Busan Kyung Sung University Electrical and Electron Engineering

*MAR. 2000~FEB.2002 Information& Communication High School  - Electrical

•Language :             

*GoodEnglishcommunication skills                              

*OrdinaryEnglishwriting skills                          

Qualification& License :

  • certificate & certification

-International certificate-

1) Installation and Maintenance of Ex Equipment in ATEC

2) Certificate for Electrical and Instrumentation Engineering  in IDC Technologies

3) ATEX- Ex certificationEx installations guide according to IEC 60079-14&17 and IEC 61892-7

  • Potentially explosive atmospheres
  • Area classification
  • Explosion theory
  • Equipment- and gas groups
  • Methods of protection
  • Marking of equipment
  • Temperature classes
  • IP classes
  • Ex motors
  • Cables
  • Glands
  • Earthing

4) ATEX- FSE 2013 Low-voltage and high-voltage certification in Trainor

5) IEC 61508 / ANSI/ISA-S84.01 - SIL<Safety Integrity Level> Certification in South Korea Gas safety Corporation.

6) ATEX /PED Directives in TrainingPortal

7) IEC Ex & ATEX Approved – HAZARDOUS AREA AND EX EQUIPMENT INSTALLATION in Atex Inspections Ltd.

  • MODULE 1: INTRODUCTION TO HAZARDOUS AREAS
  • MODULE 2: Ex EQUIPMENT FOR HAZARDOUS AREAS
  • MODULE 3: INSPECTION AND MAINTENANCE IN HAZARDOUS AREAS

8) HAZARDOUS AREA INSTRUMENTATION in Abhisam

  •    Basic Concepts of Hazardous Areas & Materials
    • Area, Material and Temperature Classification
    • International Standards related to Hazardous Areas
    • Methods of Protection (including  Explosion proof, Intrinsic Safety, Pressurization, Increased Safety & others)
    • Fieldbus in Hazardous Areas
    • Certification & Labeling (including ATEX requirements)
    • Inspection and Maintenance

9) NORSOK Standard Z-015  <Temporary equipment>  Certification in Trainor

Relation between the regulations and NORSOK : Definitions and roles : Requirements regarding fire, gas, and safety : Requirements for electrical installations : Interface with facility : Safety equipment for diesel engines :Technical documentation

 10) PERMIT TO WORK PTW –in DOF GROUP (CPD Certified)

 11) IECEx Appoval Hazardous Area Awarence certificate in Competency Training

  IECEx System Rules and IECEx OD 521 Procedures – Assessment conducted by Competency Training.

  • Ex000_Basic knowledge and awareness to enter a site that includes a classified hazardous area
  • Ex001_ Apply basic principles of protection in explosive atmospheres

 12) CompEx  Certificatio    EX01, EX02, EX03, EX04,   certificate no. 49849

 13) EEHA  Certification in Plumpton Group for Electrical Equipment for Hazardous Areas awards

 14) Electrical Approval Certificate in Apave International  

For H0 SITE MANAGER and B0 SITE MANAGER ref No.525977

 15) Start -Up and Modification of the “Functional Safety” SIL - Safety Integiry Level in TUV NORD

•PROFESSIONAL EXPERIENCE

- Supervising E&I Construction

  • cable tray Check activity
  • cable pulling Check activity
  • E&I panels` installation Check activity
  • E&I junction boxes installation Check activity
  • E&I cable termination activity for the E & I equipment Check activity
  • Installation of the transformers Installation of the cable tray (LV and HV) Check activity
  • Cable terminations Check activity
  • Cable testing : continuity & Megger Test and Hi Pot Test(for HV cables) Check activity
  • heat tracing Check activity

- supporting the commissioning requirements and cooperating with the Quality Department;

- Quality Control Inspection, Testing and correctly documentation(ITR,MC Check sheet) to ensure correct and proper installation of all the field Instruments, Junction Boxes ,Cable Tray, Marshalling Panels, DCS, (Yokogawa, Honeywell and Siemens) Control Panels

- Receiving inspected to Instrument Equipment also, documentation. <Panel>

-Involved in FAT(Factory Acceptance Test) & SAT(Site Acceptance Test) Activities

- Inspection the equipment and devices used in the project meets the required specifications per project requirements, Standard and tested in accordance with the procedures.

-Inspection for field and Control System Wiring termination, in accordance to Project approved Drawings

- Inspection of Electrical Equipment function test and Illumination level testing of lighting system.

- Inspection of E&I installation cabinet Monitoring control cabinet wiring, Termination, cable routing & cable tray installation.

- Inspection of Switch Gear Panel installation, Cable Termination and Bus bar torque.

- Installation of control panel marshalling panels and termination continuity and Meggar test .

- Inspection of Ground Rod and Grounding cable, as per Engineering Specification.

- Write of Electrical Inspection Reports

- Inspection of Heat Tracing panel Installation, Junction Box Installation and Heat tracing cable laying and Meggar test

- Vendor Package Inspection.

- Witness of Motor Test

- ATEX equipment Inspection for (Instrument equipment.)

- Quality Control Inspection, Testing and correctly documentation(ITR,MC Check sheet) to ensure correct and proper installation of all the field Instruments, Junction Boxes ,Cable Tray, Marshalling Panels, DCS, (Yokogawa, Honeywell and Siemens) Control Panels

- Receiving inspected to Instrument Equipment also, documentation. <Panel>

-Involved in FAT(Factory Acceptance Test) & SAT(Site Acceptance Test) Activities

- Inspection the equipment and devices used in the project meets the required specifications per project requirements, Standard and tested in accordance with the procedures.

-Inspection for field and Control System Wiring termination, in accordance to Project approved Drawings

- Inspection of Electrical Equipment function test and Illumination level testing of lighting system.

- Inspection of E&I installation cabinet Monitoring control cabinet wiring, Termination, cable routing & cable tray installation.

- Inspection of Switch Gear Panel installation, Cable Termination and Bus bar torque.

- Installation of control panel marshalling panels and termination continuity and Meggar test .

- Inspection of Ground Rod and Grounding cable, as per Engineering Specification.

- Write of Electrical Inspection Reports

- Inspection of Heat Tracing panel Installation, Junction Box Installation and Heat tracing cable laying and Meggar test

- Vendor Package Inspection.

- Witness of Motor Test

- ATEX equipment Inspection for (Instrument equipment.)

2. Education Completion  

1) HYUNDAI HEAVY INDUSTRIES CO.LTD   <Inspector Education>

offshore plant & gas & Oil platform   -  <1Electric 2. Instrument 3.Explosion Safety>

2) HYUNDAI HEAVY INDUSTRIES CO.LTD  <Control Education>

Industrial Robot & Mechanical operatingand control -  <1.Commissioning 2. Machine through the remote Control teaching>

-International education & training certificate-

1)Equinor  Values  – English Version

2) Hazardous Area Cable Gland Installation awareness  <CMP Products>

-Korea certificate-

1) Design Engineers certification

2) Certificate of internet, Microsoft Word, Excel, PowerPoint, Access, and Outlook

Achievements:

*Special award from the Korea Design contests Competition         

* Personal computer contests technology, South Korea passed the test

• Experience :

MAY.2018~Present

Wood. Group MUSTANG  (Wood plc)                                  

Location : DSME Okpo & DSHI Shinhan & Honeywell factory in Cheonan

Project : TengizChevrOil(TCO)  FGP Project              

# Electrical & Instrument QC Inspector

  1. Carry out the Monitoring  build of cabinets against approved drawings, issued specifications and approved Inspection & Test Plans
  2. Carry out the Marshalling & System cabinet inspection at Cheonan Honeywell Factory. with Honeywell QC engineer.
  3. Raising punch lists Issue and closed
  4. Reported  to the UK based Project QC Lead Coordinator and it’s shared  with Fabrication Team of Honeywell, Project  Test Team of Honeywell, Responsible QA Engineer of Honeywell, Client Quality Engineer(TCO)
  5. Carry out PAS,DCS,SIS,ICSS,ESD,FGS,NETWORK, system automation cabinet packing works.
  6. Carry out an Custom Inspection , FAT, Preservation, Cabinet packing works. it's Shipping Transferred- to Warehouse
  7. Bill of material <MRB> & label identification(tag) checked
  8. RIE of each cabinet Visual inspection <mechanical damaged also, scratch ,size>
  9. Preservation labels fixed ,Toxicological data sheets attached ,Corrosion inhibitor installed, Storage,Transport protrection implemented ,Ship loose items marked and preserved ,Equipment enclosures sealed off confirm, Periodical preservation carried out.,Shock watch and tilt indicators fitted check.

MAY.2016~AUG 2017                                

Location :SHI , SAMSUNG HEAVY INDUSTRIES CO.LTD   <Geo Je>

Project :NIGERIA – <Company>           TOTAL                      -EGINA  FPSO--

# Electrical & Instrument Construction Inspector

  1. Electrical & Instrument Equipment installation check. according to Company approved DWG
  2. Electrical Heat Tracing Inspection for before <Heating cable taping works> & after<Insulation & paint> Inspection. on Straight pipe & flange ,Elbows ,Tee , Valves , Support*Power connection kit & T-Splice kit inside terminal block and heat cable check & Heat tracing cable megger test
  3. Pre-commissioning Inspection.
  4. according to specification cable tray support and Punch and Ladder tray for check and Inspection <vibration,Installation,Mechanical damaged,Obstruction> check
  5. According to Specification 
  6. FLUORSCENT & FLOOD Lighting & Ceiling type compact Lighting & Junction BOX & Socket Outlet inspection
  7. Living Quarter side Motor and space hearter cable Meggar & continuity test  inspection   
  8. LQ of HVAC System AIR tubing pipe line Leak test & Pipe line check & inspection.
  9. Helideck side Lighting and cable inspection

10.  LQ each by deck Elec-service room inside of EDB such as Lv power cable Megger & continuity test , circuit breaker , EDB PANEL component test and inspection

11.  make a daily mornitoring  REPORT <risk element , improvement point>

12.  Non- Hazardous area LQ & HUll side each by deck area completion visual inspection

13.  Review a MCCR&(ITP) & Punch list

14.  TRANSFORMER INSTALLATION INSPECTION &TEST

MAY.2014~APR.2016                                            

Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD   <ULSAN>

Project :North Sea – <Company>         BP    -Q204  FPSO & Clair ridge Platform-

# Electrical & Instrument & Tellecom & Ex (Atex) Inspector

  1. Electrical & Instrument Equipment installation check. according to Company approved DWG
  2. using a ShareCat  PJT process system
  3. Electrical Heat Tracing Inspection for before <Heating cable taping works> & after<Insulation & paint> Inspection. on Straight pipe & flange ,Elbows ,Tee , Valves , Support*Power connection kit & T-Splice kit inside terminal block and heat cable check & Heat tracing cable megger test
  4. Power connection kit & T-Splice kit inside terminal block and heat cable check
  5. PAGA and Beacone equipment Inspection.
  6. Living Quarter side Motor and space hearter cable Meggar & continuity test Inspection   
  7. LQ of HVAC System AIR tubing pipe line Leak test & Pipe line check & Inspection.
  8. Helideck side Lighting and cable inspection
  9. LQ each by deck Elec.service room inside of EDB such as Lv power cable Meggar & continuity test , circuit breaker , EDB PANEL component test and inspection

10.  make a daily mornitoring  REPORT <risk element , improvement point>

11.  Non- Hazardous area LQ side each by deck area completion visual inspection

12.  F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check

13.  Review a MCCR&(ITP) & Punch list

# ATEX- Ex Inspection

* EX Inspection Equipment, Mechanical completion A-check record make a complete

* EX register and EX certificate and vendor data & drawing EX installation inspection completed

* Top side, Hull side, HVAC side, living quarter side  EX equipment inspection completed

* HHI on-shore yard EX equipment installation inspection

* Publish a Punch A&B make a completed.

JUNE.2013~MAY.2014

Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD    <ULSAN>

Project :NORWAY – <HHI>               STATOIL                     -Goliat  FPSO--

# Electrical & Instrument & Tellecom Construction Inspector

  1. Electrical & Instrument Equipment installation check. according to Company approved DWG
  2. using a ProCoSys PJT process system
  3. LER,CER,CCR,TER Inside a Panel of the E&l&T cable and Equipment Inspection.
  4. Electrical Heat Tracing Inspection for before<Heating cable tape> & after<Insulation & paint> Inspection  on the (Straight pipe & flange ,Elbows ,Tee , Valves , Support)
  5. Power connection kit & T-Splice kit inside terminal block and heat cable check
  6. according to specification cable tray support and Punch and Ladder tray Observation and Inspection  <vibration,Installation,Mechanical damaged,Obstruction> check
  7. EDB Circuit and roof check test and inspection
  8. Tubing pipe line - leak test & Package system leak test
  9. AssociatedyardTubing pipe andinstrumentEquipment inspection

10.  Mccr panel & junction box cable leading to checks and tests

11.  High-voltage Hi-pot test cable and low voltage meggar test & point to point test cables and multi-cable checks and tests

12.  Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks

13.  Lighting cable and Equipment and circuit test and inspectrion.

14.  F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check

15.  Review a MCCR&(ITP) & Punch list

# ATEX- Ex Inspection & Coordination

* EX check sheet  E18A make a completed.

* EX Inspection Equipment, Mechanical completion A-check record make a complete

* EX register and EX certificate and vendor data & drawing EX installation inspection completed

* Top side, Hull side, HVAC side, living quarter side  EX equipment inspection completed

* HHI on-shore yard EX equipment installation inspection

* Publish a Punch A&B make a completed.

MARCH.2013~JUNE.2013             

Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD   <ULSAN>

Project :QATAR – <Company>  RASGAS                           -Barzan Gas Platform-

# Electrical & Instrument & Tellecom Construction Inspector

  1. Electrical & Instrument Equipment installation check. according to Company approved DWG
  2. Electrical Heat Tracing Inspection for before<Heating cable tape> & after<Insulation & paint> Inspection  on the (Straight pipe & flange ,Elbows ,Tee , Valves , Support)
  3. Power connection kit & T-Splice kit inside terminal block and heat cable check
  4. Heat tracing cable megger test
  5. Strong English communication skills
  6. EDB Circuit and roof check test and inspection
  7. Tubing pipe line - leak test & Package system leak test

AssociatedyardTubing pipe andinstrumentEquipment inspection

  1. Mccr panel junction box cable leading to checks and tests

High-voltage cable and low voltage cables and multi-cable checks and tests

  1. Tellecom - PAGA System & Fiber optical cable & vendor cable inspection –    OTDR Test list checks

10.  Lighting cable and Equipment and circuit test and inspectrion.

11.  F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check

12.  Review a MCCR&(ITP) & Punch list

APR.2012~OCT.2012          

Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD   <ULSAN>

Project : Myanmar – <Company> Daewoo International          -SHWE GAS Platform-

# Electrical & Instrument & Tellecom Construction Inspector

  1. Electrical & Instrument Equipment installation check. according to Company approved DWG
  2. LER,CER,CCR,TER Inside a Panel of the E&l&T cable and Equipment Inspection.
  3. Strong English communication skills
  4. EDB Circuit and roof check test and inspection
  5. Tubing pipe line - leak test & Package system leak test
  6. AssociatedyardTubing pipe andinstrumentEquipment inspection
  7. Mccr panel junction box cable leading to checks and tests
  8. High-voltage cable and low voltage cables and multi-cable checks and tests
  9. Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks

10.  Lighting cable and Equipment and circuit test and inspectrion.

11.  F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check

12.  Review a MCCR&(ITP) & Punch list

JUNE.2011~NOV.2012              Commissioning

Location : Europe Czechoslovakia

Europe Czechoslovakia -

  1. vendor package & Mechanical equipment Inspection & operating

<Commissioning,Mechanical vendor package Electric equipment inspection>

OCT.2010~MAY.2011                   

Location : HHI ,HYUNDAI HEAVY INDUSTRIES CO.LTD   <ULSAN>

Project :Australia -<Company>  Woodside                         -NR2 GAS Platform-

# Instrument & Electrical & Tellecom  Inspector

  1. Electrical & Instrument Equipment installation check. according to Company approved DWG
  2. Electrical Heat Tracing Inspection for before<Heating cable tape> & after<Insulation & paint> Inspection  on the (Straight pipe & flange ,Elbows ,Tee , Valves , Support)
  3. Power connection kit & T-Splice kit inside terminal block and heat cable check
  4. Heat tracing cable megger test
  5. Strong English communication skills
  6. EDB Circuit and roof check test and inspection
  7. Tubing pipe line - leak test & Package system leak test
  8. Associatedyardpiping andinstrumentEquipment inspection
  9. Mccr panel junction box cable leading to checks and tests

10.  High-voltage cable and low voltage cables and multi-cable checks and tests

11.  Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks

12.  Lighting cable and Equipment and circuit test and inspectrion.

13.  F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check

14.  Review a MCCR&(ITP) & Punch list

OCT.2007~MAY.2009                   

Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD    <ULSAN>

Project  : ANGOLA                                                           -LNG Plant-

# Instrument & Electrical & Tellecom Inspector

  1. Electrical & Instrument Equipment installation check. according to Company approved DWG
  2. according to specification cable tray support and Punch and Ladder tray for check and Inspection <vibration,Installation,Mechanical damaged,Obstruction> check
  3. Strong English communication skills
  4. EDB Circuit and roof check test and inspection
  5. Tubing pipe line - leak test & Package system leak test
  6. Associatedyardpiping andinstrumentEquipment inspection
  7. Mccr panel junction box cable leading to checks and tests
  8. High-voltage cable and low voltage cables and multi-cable checks and tests
  9. Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks

10.  Lighting cable and Equipment and circuit test and inspectrion.

11.  F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check

12.  Review a MCCR&(ITP) & Punch list

Skills
  • ATEX / CompEx Inspection 10 years by 2019
Employers
  • E&I Inspector at Wood.
    2018 May - Jun 2019
    MAC QC Inspection
  • E&I Inspector at Total E&P
    2016 May - Aug 2017
    Hull Electrical & Instrument & Tellecom Inspection
  • E&I Inspector at BP
    2014 May - Mar 2016
    FPSO & Gas Flatform QA/QC Inspection
Educations
  • Bachelor Degree
    Electrical & Electronics Engineering at Kyungsung University
    2004 - 2008
Certifications
  • Electrical and Instrument Engineering Oct 2017
  • CompEx 01-04 Sep 2015
  • EEHA Aug 2015
Documents
Ulsan, Ulsan,
View Contact Information